LAC+USC WEST POWER PLANT
Project Description
This award winning design build project to install the 480-volt infrastructure to replace (2) 500-ton chillers and provide future expansion for a third chiller in the future if required. Careful planning was required to keep the plant up and running while each chiller was replaced separately. With new pumps and a cooling tower A-1 Electrics IBEW Local 11 electricians completed the power and control wiring working along Johnson Controls and Eaton Corp to provide the client with a turnkey project.
Client
LAC+USC
General Contractor
EATON Corporation
Category
Healthcare
Project Date
2014
Learn how A-1 Electric Service Co., Inc. can help with your next project.


